Built out a little bit of a “hub” room today, where the main power switch for the campus can sit, and where we can do some of the inter-building belt routing.

With that built out and connected up, I was able to route all the belting and power for the first building, and get it powered up.

Well, everything except the Limestone feed, which is gonna come from the opposite side of the campus than the Quartz.

Wide shot, including more Tubeway.