Portions of this thread copied from a Starship Dev thread on r/SpaceX.
FAQ
- When next launch? (IFT-6) SpaceX announce are targeting Tuesday Nov 19th at 16:00 CT (22:00 UTC) for flight 6, and Mission page with info on mission objectives and changes since flight 5.
- When previous launch? (IFT-5)? Booster 12 and Ship 30 launched on 2024-10-13.
- What was the result? Booster caught by chopsticks, ship makes an on-target splashdown.
Quick Links
Nerdle Cam | Lab Cam | Sapphire Cam | Sentinel Cam | Rover Cam | Rover 2.0 Cam | Rocket Ranch Cam | Plex Cam | NSF Starbase Live
Starship Dev October | IFT-5 launch thread | Starship Dev 57 | Starship Dev 56 | IFT-4 launch thread | Starship Dev 55
Official SpaceX Starship Update Video (2024-04-06)
Road closures
Cameron County website - @bocaroad Mastodon bot
*As of 2024-11-17
- 2-hour road delays are posted for Nov 1st (01:00 to 04:00) and 2nd (00:00 and 03:00) for transport from Massey’s to factory. (Presumably S33 rollback)
- 1-hour road delays are posted for Nov 11th (19:00 to 22:00) and 12th (10:00 to 13:00) for transport from factory to pad, likely B13 rollout.
- 1-hour road delays are posted for Nov 13th (00:00 to 03:00 or 12:00 to 15:00) and 14th (00:00 to 03:00) for transport from factory to pad, either backups for B13 rollout or for S31 rollout.
- 8-hour road closure is scheduled for Nov 17th (08:00 to 16:00) for non-flight testing activities.
- 14-hour road closures are posted for Nov 18th, 19th, and 20th (all 08:00 to 22:00), for flight testing activities, presumably IFT-6.
Vehicle Status
*As of 2024-11-17
Follow Ring Watchers on Twitter and Discord for more.
Ship | Location | Status | Comment |
---|---|---|---|
S20 | Rocket Garden | Pending scrapping? | |
S26 | Rocket Garden | Pending scrapping? | Static fire Oct. 20. No fins or heat shield, multiple mysterious changes. Completed 3 cryo tests, latest on Oct 10. Rolls to Massey’s May 8th, cryo test May 24th, static fired Jun 3rd, rolls to rocket garden Jun 12th. Moves to Megabay 2 Aug 13th, raptors removed Aug 14th. |
S30 | Indian Ocean | Successful splashdown | 2x cryo: Jan 3rd and Jan 5th. Engines installed ~Apr 9th. Static fired May 8th. Heatshield replacement completed by Jul 20. Static fired Jul 26th. Raptor replacement Aug 3rd. Spin prime Aug 6th. Full stack cryo tests Sep 23rd and Oct 7th. FTS installed Oct 9th. Launched Oct 13th, with on-target splashdown in Indian Ocean. |
S31 | Stacked on B13 | Pending launch | Cryo tested May 12th, suffers small electrical fire. Underwent repairs in the Highbay, rolls back to Massey’s Jul 1. Cryo tested Jul 2nd and 3rd. Engines installed by Jul 26th. Rolls to Massey’s Sep 6th. Partial (aborted) cryo test Sep 8th. Static fired Sep 18th. Preflight checkouts completed Nov 17th. |
S32 | Rocket Garden | Pending scrapping? | Fully stacked, fore flaps installed but not aft flaps |
S33 | Megabay 2 | Pending engine install | First V2 Starship. Nosecone spotted Jul 14th. Forward section spotted Jul 27th. Stacking completed Aug 23. Cryo tested Oct 29th (partial), 30th (full), and 31st (full). Raptor installation begins Nov 9th. |
S34 | Starfactory | Stacking | Methane header tank spotted Aug 14th. Nosecone stacked on payload bay Sep 20th. |
S35 | Starfactory | Parts spotted | Parts spotted Sep 20th. |
Booster | Location | Status | Comment |
---|---|---|---|
B12 | Megabay 1 | Post-flight inspection | Cryo x2, Static fire Jul 15th. Full stack cryo tests Sep 23rd and Oct 7th. FTS installed Oct 9th. Launched as IFT-5 on Oct 13, returned to launch site for successful chopstick catch. Moved to Megabay 1 Oct 15th. |
B13 | Pad A | Pending launch | Cryo tests Apr 26th (methane tank) and Apr 29th (LOX tank). Static fired Oct 24th. Preflight checkouts completed Nov 17th. |
B14 | Megabay 1 | Pending gridfin install | Stacked Apr 26th, Cryo tested Oct 4th and 5th. |
B14.1 | Sanchez | Resting | Multiple catch simulation “slap tests” performed on Jun 26th and 27th. |
B15 | Build Site | Assembly | Potential aft end, common dome section, aft tank section, and forward dome spotted. |
B16 | Build Site | Assembly | Parts spotted |
B17 | Build Site | Assembly | Parts spotted |
Resources
- LabPadre Channel | NASASpaceFlight.com Channel
- NSF: Booster 7 + Ship X (likely 24) Updates Thread | Most Recent
- NSF: Boca Chica Production Updates Thread | Most recent
- NSF: Elon Starship tweet compilation | Most Recent
- SpaceX: Website Starship page | Starship Users Guide (2020, PDF)
- FAA: SpaceX Starship Project at the Boca Chica Launch Site
- FAA: Temporary Flight Restrictions NOTAM list
- FCC: Starship Orbital Demo detailed Exhibit - 0748-EX-ST-2021 application June 20 through December 20
- NASA: Starship Reentry Observation (Technical Report)
- Hwy 4 & Boca Chica Beach Closures (May not be available outside US)
- Production Progress Infographics by @RingWatchers
- Raptor 2 Tracker by @SpaceRhin0
- Acronym definitions by Decronym
- Everyday Astronaut: Starbase Tour with Elon Musk, Part 1 | Part 2 | Part 3
- Everyday Astronaut: 2022 Elon Musk Interviews, Starbase/Ship Updates | Launch Tower | Merlin Engine | Raptor Engine
- Everyday Astronaut 2024 Elon Musk Interviews: Starfactory tour | Pad tour and post-IFT-4 interview
Starbase activities (2024-11-17):
- Nov 14th addendum: Doherty timelapse of S31 stacking on B13.
- Nov 16th cryo delivery tally.
- Launch site: Overnight, the launch mount work platform is moved away from Pad A. (ViX)
- The detonation suppression system is tested. (ViX)
- Road is closed. (LabPadre)
- B13 and S31 conduct a wet dress rehearsal. (NSF livestream)
- Tower and launch mount venting. (LabPadre, ViX, NSF)
- Partial propellant load on methane and LOX tanks on both B13 and S31. (LabPadre, ViX, NSF, Beyer)
- Propellant loading stops. (LabPadre, NSF)
- Propellant is detanked. (NSF)
- Testing is concluded. (LabPadre, Starship Gazer)
- Timelapses of the day’s testing. (ViX, Priel)
- SpaceX confirm completion of propellant load test and preflight checkouts.
- Road is opened and cryo deliveries resume. (ViX)
- SpaceX’s private 737 overflies Starbase. (ViX, Priel, Evans, NSF 1, NSF 2, Beyer, GroundTruth (John Cargile))
- Build site: Starkitty is sighted :)
- Office building externals look complete. (GIsler)
- Construction on passageway between Starfactory and offices continues. (Gisler)
IFT-6:
- Starbase range security assets begin to appear on tracking maps. (Cornwell)
- Two ships depart from Australia and head towards the splashdown location, potentially to deploy buoys. (Cornwell 1, Cornwell 2)
Starbase activities (2024-11-16):
- Nov 15th cryo delivery tally.
- Pad A: Overnight, FTS is installed on B13. (LabPadre, ViX, Beyer, NSF)
- Booster transport stand leaves the launch complex. (ViX)
- Ship transport stand moves from Pad A to storage area. (ViX)
- Rover 2 video tour of launch site. Closeups of B13 FTS boxes, fence removal, digging, LN2 tanker. (ViX)
- New shielding covering the waterfall valves beside the booster quick disconnect is spotted. (Anderson / Starship Gazer)
- D Wise posts recent close-ups of S31.
- Build site: B14’s grid fins move from Starfactory towards Megabay 1. (ViX 1, ViX 2, ViX 3)
- RGV Aerial post recent flyover photos of the build site, launch mount B construction, and Pad A.
Starbase activities (2024-11-15):
- Nov 14th cryo delivery tally.
- Nov 14th addenda: ViX and Priel timelapses of S31 stacking. Side-by-side comparison of all seven full stackings.
- Pad A: Overnight, ship quick disconnect connects to S31. (LabPadre)
- Scaffolding is removed from the launch mount, and access hole covers are welded. (ViX 1, ViX 2)
- Launch mount work platform is lowered. (ViX)
- B13 performs an igniter test. (ViX, Golden)
- B13 performs a gridfin wiggle test. (ViX, Priel)
- Launch mount detonation suppression system is tested. (ViX, Priel)
- S31 performs an igniter test. (ViX)
- Workers install flight termination systems on B13. FTS for S31 might already be installed. (Starship Gazer 1, Starship Gazer 2, Starship Gazer 3, Golden)
- B13 closeups from D Wise. (Tweet 1, tweet 2)
- Pad B: Draw works dead end spool cradle spotted is en route. (ViX)
- Build site: B16’s downcomer moves from Starfactory to Megabay 1. (ViX 1, ViX 2)
IFT-5:
- SpaceRhin0 summary of recovered engines.
IFT-6:
- SpaceX announce an updated target date of Tuesday Nov 19th at 16:00 CT (22:00 UTC), due to weather.
Other:
Starbase activities (2024-11-14):
- Nov 13th cryo delivery tally.
- Pad A: Overnight, B13 rolls out to Pad A. (LabPadre, ViX, Starship Gazer 1, Starship Gazer 2, Priel, Gisler, NSF 1, NSF 2, NSF 3, SpaceX, NSF livestream)
- B13 is lifted onto the launch mount. (LabPadre, ViX, Starship Gazer, Priel, NSF, D Wise, cnunez 1, cnunez 2, cnunez 3, cnunez 4, clwphoto1)
- Ship lifting pins on the chopsticks are deployed. (ViX)
- Chopsticks close around S31. (NSF, Evans)
- S31 is stacked on B13. (NSF 1, NSF 2, NSF 3, Evans, Ramirez 1, Ramirez 2, NSF livestream)
- Golden thinks the timeline is tight for a Monday launch.
- A large piece of pipe is lifted into position near the new recondensers. (ViX)
- Pad B: The LR11000 crane is laid down, and the tip is removed and shipped out on a truck. (ViX 1, ViX 2)
- Build site: B16’s A5:4 section moves into Megabay 1. (ViX)
- The SpaceX “X” logo on the new offices is illuminated. (cnunez, Beyer, interstellargw, ViX)
- 8-hour road closure is scheduled for Nov 17th (08:00 to 16:00) for non-flight testing activities.
Starbase activities (2024-11-13):
- Nov 12th cryo delivery tally.
- Nov 12th addendum: Pad A photos from Starship Gazer. (Ship 31, nose test tiles, launch mount, aft flaps being secured)
- Build site: Overnight, all three of S34’s outer transfer tubes are lifted to the installation jig in Megabay 2. (ViX)
- Booster transport stand arrives at the build site and enters Megabay 1. (ViX)
- B13 is transferred onto the transport stand and emerges from Megabay 1 in preparation for rollout. (ViX 1, ViX 2 (employee photo op), LabPadre, Starship Gazer, Golden 1, Golden 2, clwphoto1, NSF livestream)
- B16’s A5:4 section is staged outside Megabay 1. (ViX, Gisler 1, Gisler 2)
- cnunez posts a photo of three nosecones in Starfactory, likely for S35, S36, and S37.
- Office construction continues. Application of the SpaceX logo begins. (ViX 1, ViX 2, ViX 3, Gisler)
- Pad B: The LR11000 is being prepared to be laid down prior to IFT-6. (ViX)
- Pad A: S31 has a banana on each side. (Gisler, cnunez)
- 14-hour road closures are posted for Nov 18th, 19th, and 20th (all 08:00 to 22:00), for flight testing activities, presumably IFT-6.
- NOTAM and NOTMAR are posted for IFT-6.
McGregor:
- A Raptor 3 has a hard start a rough start on the horizontal stand. (Hayden / NSF)
Starbase activities (2024-11-12):
- Nov 11th cryo delivery tally.
- Nov 11th addendum: NSF timelapse of S31 rollout.
- S31 is now near Tower A. (cnunez, SpaceX)
- Drawworks motor is delivered and installed on Tower B. (ViX 1, ViX 2, Golden 1, Golden 2)
- Sanchez: Launch mount B construction continues. The fourth and final side section is lifted into position. (Golden)
- Rocket Garden photo from cnunez.
Other:
- mcrs987 counted the number of tiles removed from S31.
Starbase activities (2024-11-11):
- Nov 10th cryo delivery tally.
- Build site: S31 emerges from the Highbay, counterweights are the SPMTs, S31 retreats back inside. (LabPadre, ViX 1, ViX 2, Starship Gazer, NSF)
- Closeup photos from Starship Gazer: Nose, aft.
- Heatshield comparisons from Ringwatchers and mcrs987.
- Construction on passageway between Starfactory and offices continues. (Gisler 1, Gisler 2, Gisler 3)
- RGV Aerial post a recent flyover photo of the build site.
- In the evening, S31 rolls out to the launch complex. (LabPadre, ViX, Starship Gazer 1, Starship Gazer 2, Gisler, cnunez, Gomez, clwphoto1 1, clwphoto1 2, NSF 1, NSF 2, NSF 3, NSF 4, NSF 5, NSF livestream)
- Pad A: Flame deflector is tested. (LabPadre, ViX, NSF)
- A large spool of orange arrives at the launch complex. (Gisler)
- Pad B launch mount and flame trench renders from ChromeKiwi. (Tweet 1, tweet 2)
Starbase activities (2024-11-01):
- Oct 31st cryo delivery tally. ViX shares an outdated but useful infographic on how many deliveries are required for launch.
- Oct 31st addendum: NSF timelapse of S33 cryo test at Massey’s.
- Pad B: The disassembled CC8800-1 crane begins to depart, starting with crane mats and counterweights. (ViX 1, ViX 2)
- Build site: S34 aft LOX section moves from Starfactory to Megabay 2. (ViX)
- RGV Aerial post a recent flyover photo of office construction.
- Massey’s: S33 prepares for rollback. (ViX 1, ViX 2, ViX 3, Starship Gazer)
Other:
- NSF article on pending upgrades to Starship facilities in Florida.
- Additional highlight summaries on Starship HLS mockup from Kirtland, Bickmore, and Li. Two floors, five bedrooms, laboratory, airlock, life support, four control seats, and a 40-foot ceiling in one area.
Starbase activities (2024-11-07):
- Nov 6th cryo delivery tally.
- Pad A: The remaining subcooler is lifted into position. (ViX, Gisler)
- Work on chopsticks continues. Workers observed on the booster quick disconnect. (cnunez, ViX)
- Pad B: CC8800-1 disassembly continues. Six truckloads depart from the launch site. (ViX, Gisler 1, Gisler 2)
- Build site: Scaffolding is delivered, glass installation continues on the passageway between Starfactory and offices. (ViX)
- Two new semi-circular work platforms arrive at Megabay 2. (ViX)
- Booster CO2 tank moves from Starfactory towards Megabay 1. (ViX)
- Hotstage ring spotted outside Megabay 1. (Anderson / LabPadre)
- S31 receives a “banana for scale” sticker. (Starship Gazer, Mary, Gisler, cnunez, Ramirez)
- Sanchez: Launch mount B construction continues. The GMK 7550 crane lifts the first and second (of four) side sections into position. (ViX 1, ViX 2, ViX 3)
- Rocket Garden: Counterweights are added to SPMTs, likely in preparation for B13 rollout. (ViX)
- 1-hour road delays are posted for Nov 11th (19:00 to 22:00) and 12th (10:00 and 13:00) for transport from factory to pad, likely B13 rollout.
McGregor:
- The tripod stand is being retired. Some tanks are removed. (NSF)
Starbase activities (2024-11-06):
- Nov 5th cryo delivery tally.
- Pad B: CC8800-1 crane disassembly continues. Two more truckloads of parts depart. (ViX, NSF 1, NSF 2, NSF 3, Gisler 1, Gisler 2, Gisler 3)
- RGV Aerial post a recent flyover photo of the launch site.
- Some sort of box/cover is lifted into place at the tank farm. (clwphoto1)
- Construction on passageway between Starfactory and offices continues. Window installation in progress. (Gisler)
- Build site: The A4:4 LOX section for B16 moves from Starfactory to Megabay 1. (ViX)
- Sanchez: Construction continues on launch mount B. All four corner sections are in place. (ViX 1, ViX 2)
- The pez load has shrunk. (ViX)
IFT-6:
-
FAA NOTAMN is posted for Nov 18th through 26th. (LabPadre)
-
SpaceX announce November 18th as the NET date for flight 6, and post info on mission objectives and changes since flight 5. Highlights:
Hardware upgrades for this flight add additional redundancy to booster propulsion systems, increase structural strength at key areas, and shorten the timeline to offload propellants from the booster following a successful catch. Mission designers also updated software controls and commit criteria for the booster’s launch and return.
An additional objective for this flight will be attempting an in-space burn using a single Raptor engine, further demonstrating the capabilities required to conduct a ship deorbit burn prior to orbital missions.
The flight test will assess new secondary thermal protection materials and will have entire sections of heat shield tiles removed on either side of the ship in locations being studied for catch-enabling hardware on future vehicles. The ship also will intentionally fly at a higher angle of attack in the final phase of descent, purposefully stressing the limits of flap control to gain data on future landing profiles. Finally, adjusting the flight’s launch window to the late afternoon at Starbase will enable the ship to reenter over the Indian Ocean in daylight, providing better conditions for visual observations.
Starbase activities (2024-11-05):
- Nov 4th cryo delivery tally.
- Overnight, four new curved work platforms are delivered to Megabay 2. (ViX 1, ViX 2, ViX 3)
- Transfer tube spotted in Megabay 2, likely for S34. (ViX)
- Starkitty is sighted :)
- Pad B: CC8800-1 disassembly continues. (ViX 1, ViX 2, ViX 3, ViX 4, NSF)
- Flame trench construction continues. (ViX)
McGregor:
- A Raptor 3 undergoes an RUD on the vertical test stand. (_jaykeeganN_ / NSF)
Other:
Starbase activities (2024-11-04):
- Not too much action reported today.
- Pad B: Concrete pouring for the flame trench. (ViX)
- Sanchez: More sections are delivered for launch mount B. (NSF)
- cnunez posts recent photos of launch mount parts (tweet 1, tweet 2), nosecone (S35?) in Starfactory, and S31 in the Highbay.
Other:
- Assembly animation of launch mount B. (Spacex 3D Creation Eccentric)
- Tweet thread from mcrs987 with selected Starship-related internal emails within the United States Fish and Wildlife Service, reportedly acquired by a Freedom Of Information Act request: Tweet 1, tweet 2, tweet 3, tweet 4, tweet 5, tweet 6, tweet 7, tweet 8, tweet 9, tweet 10, tweet 11, tweet 12, tweet 13, tweet 14.
- As the above tweet thread may have some bias against the FWS, I am including a link to the original FOIA here: https://www.fws.gov/media/doi-fws-2023-004473-2nd-reponse-records
Starbase activities (2024-11-10):
- Nov 9th cryo delivery tally.
- Nov 9th addendum: S31 moves out of the corner of Highbay. (ViX)
- Sanchez: Launch mount B construction continues. The fourth and final side section is delivered. (ViX)
- Build site: All six of S33’s raptors have now arrived at Megabay 2. “In sequence, we had RV275, RV305, RC385, RC345, RC316 and RV398.” (ViX)
- cnunez posts recent photos of S31 and chopsticks carriage for Pad B.
- RGV Aerial post a recent flyover photo of Pad B / Pad West.
Other:
- Chinese launch startup Cosmoleap are already testing their own prototype tower and chopsticks hardware. (CNSpaceflight)
Starbase activities (2024-11-08):
- Nov 7th cryo delivery tally.
- Sanchez: Launch mount B construction continues. The third (of four) side sections is lifted into position. (ViX)
- Build site: Overnight, scaffolding is removed from S31. (ViX)
- Hot stage adapter moves from Starfactory towards Megabay 1. (ViX 1, ViX 2)
- CO2 tank is lifted, presumably up to B13. (ViX)
- Boxes labeled SN1 and SN2 are spotted. (LabPadre)
- Two SPMTs arrive at the build site. The LTR1220 crane shifts some of the counterweights, and the SPMTs enter the Highbay. (ViX 1, ViX 2)
- cnunez posts a recent photo of a partially tiled nosecone in Starfactory.
- Pad A: The chopsticks and the ship quick disconnect are tested. (ViX 1, ViX 2, ViX 3)
- Pad B: The LR11000 crane removes a net from Tower B. (ViX)
- 1-hour road delays are posted for Nov 13th (00:00 to 03:00 or 12:00 to 15:00) and 14th (00:00 to 03:00) for transport from factory to pad, either backups for B13 rollout or for S31 rollout.
McGregor:
- Final tank is removed from the tripod stand. (Adam Cuker / NSF)
- Tom Mueller is sad to see it go.
Other:
Awesome post, OP. Thank you!!
You’re welcome! Glad to know it is appreciated!